Wastewater Construction Standards
Water Standards
Blow-Off Assembly for 8-inch and Larger Pipe
Blow-Off Assembly for 6-inch and smaller Pipe
Blow Off Assembly
2-Inch Turbine Meter w/ Bypass
4-Inch Compound Meter w/ 1-Inch Bypass
3-Inch Turbine Meter Installation
3-Inch Compound Meter w/ 1-Inch By-Pass Installation
1-1/2-Inch Meter Installation
1-Inch Meter and 1-Inch Service Installation
3/4-Inch Water Meter Installation with 1-Inch Service Lateral and 3/4-Inch Pressure Reducer

